Profile and Career Objectives of HVAC Engineer Rabia Ishaq

21May/110

HVAC ENGINEER

RABIA ISHAQ

Present Address Contact Email

Rabia Ishaq C/O H#E-950,ST#06,mast Iqbal road Muhammad pura,Lahore 0345-2876596,021-4583968
[email protected]

Date of Birth N.I.C. No. Languages

25th MAY, 1984 (Khi, Pk) 42201-4565453-8 English, Urdu

Professional Objective

To pursue a career in a dynamic and growing organization with a progressive, congenial and learning work environment where I can hone my technical and managerial skills, in the field of Mechanical Engineering.

Academic Qualification

• B. Eng. In Mechanical Engineering 72% (A Grade) 2003 − 2007
NED University of Engineering & Technology,
Karachi, Pakistan.

• Higher School Certificate 78% (A Grade) 2001 − 2003
St. Joseph’s Govt. College for Women, Karachi, Pakistan
Board of Intermediate Education, Karachi

• Secondary School Certificate 87% (A-One Grade) 1999-2001
GREEN HOUSE GRAMMAR SCHOOL, Karachi, Pakistan
Board of Secondary Education, Karachi

Professional Experience

• S.Mehboob & Company Consulting Engineer(KHI) Design Mechanical Engineer Feb2008 to Aug 09
• KMNR Engineering Pvt.Limited (KHI) Design Mechanical Engineer Sep 2009 to Jan2011

Activities & Responsibilities includes:

• Block Load Calculations.
• Cooling Load Calculations on HAP (Hourly Analysis Program) AND ELITE CHVAC.
• Peak Load Calculations for Schematic Design and Tender Design.
• Psychrometric Analysis.
• Duct Sizing & Layout.
• Shafts Sizing & Layout.
• Pipe Sizing.
• Equipment Selection (FCU’S; AHU’S; Chillers; Cooling Tower).
• MEP Coordination.

PROJECTS :

• DUBAI INVESTMENT PARK, DUBAI ———-Worked as HVAC Engineer.
(Project responsibilities involved Cooling Load calculation, Equipment selection, Air Balance calculation, Duct designing,
Air device selection, Psychrometric Analysis for Tender)

• AL FURJAN, DUBAI ———-Worked as HVAC Engineer.
(Project responsibilities involved Cooling Load calculation, Equipment selection, Air Balance calculation, Duct designing,
Air device selection, Psychrometric Analysis for Tender)

• RBOUR HEIGHTS,ABU Dhabi. ———-Worked as HVAC Engineer.
(Project responsibilities involved concept design)

• OMRAN WORK FORCE ACCOMODATION , Dubai. ———-Worked as Assistant HVAC Engineer.
(Project responsibilities involved Cooling load calculation, Equipment Selection, Air Balance Calculation, Duct Designing,
Psychrometric Analysis for Tender Stage. )

•5 Port Rashid Hotel And Office Tower, Dubai ———— Worked as Assistant HVAC Engineer.
(Project responsibilities involved Cooling load calculation,Equipment Selection, Air Balance Calculation, Duct Designing,
Psychrometric Analysis for Tender Stage. )
•6 NIAGRA HEALTH HOSPITAL,CANADA ———— Worked as Assistant PLUMBING Engineer.
(Project responsibilities involved sanitry piping layout,sanitry pipe sizing.

•7 REGENT PARK, CANADA ———— Worked as Assistant HVAC Engineer.
(Project responsibilities involved Cooling load calculation, Duct Designing.

•8 NEW OAKVILLE HOSPITAL, CANADA ———— Worked as Assistant HVAC AND PLUMBING ENGINEER.
(Project responsibilities involved Cooling and heating load calculation, layout of domestic cold and hot water looped water
distribution.

Internships
• PAKISTAN INTERNATIONAL AIRLINE (PIA)

4 Weeks Duration Summer 2006
Task: Visited and studied all departments and workshops

Final Year Project
To Design Vapor Recovery Unit for Motor Gasoline for PSO

Professional Certified Courses
• PRO-E (WILDFIRE 3.0) – 1 Month Course from Paradesign
• ANSYS 10.0 – 1 Month Course from NED University

Computer Expertise

1 Engineering: AutoCAD 2006, HAP, PRO-E (Wildfire 3.0), ANSYS 10.0
2 Languages: C Language,
3 Misc.: MS Office, Windows 9x/2K/XP,

Skills

• Ability to work independently as well as Team Work Player • Decision Making & Problem Solving • Creative & Innovative • Preventative & Motivating • Analytical & Exploring

Others

• Gender: Female • Marital Status: Married

Games, Sports and General Interests

Novel Reading, TV, Cooking, Internet Surfing and Social Activities etc.

Tagged as: air conditioning engineer, graduate engineer, hvac engineer, lahore, MEP, pakistan
Leave a comment

Comments (0)
Trackbacks (0)
( subscribe to comments on this post )

No comments yet.

Leave a comment Cancel reply

(required)

(required)



No trackbacks yet.

HVAC ENGINEER »
« ENERGY EFFICIENT OPERATION OF COOLING TOWERS

Recent Posts

  • OPTIMUM CHILLER PLANT SEQUENCE OF OPERATION
  • EFFICIENCY IMPROVEMENT AND OPERATING COST REDUCTION BY BUILDING BMS SYSTEM
  • Salient Features of Energy Efficient Homes
  • Interesting story idea for your readers
  • Coordinated Practices for Green Building Design
  • Use of Thermal Images for Indoor Environmental Control
  • Absorption Chiller Suppliers
  • Improving Efficiency of Existing Data Centers
  • Electric Chiller Suppliers
  • HVAC ENGINEER
  • HVAC ENGINEER
  • ENERGY EFFICIENT OPERATION OF COOLING TOWERS
  • Salient Features of Healthcare AHU
  • Multipurpose Hall Environment Control
  • Piping Network Considerations for Air Conditioning System

Categories

  • Absorption Chiller Suppliers
  • AHU Coils
  • Air Conditioning Systems
  • Air Distribution
  • Air Filtration
  • Air Handling Units
  • Building Management System
  • Chilled Water Plant ΔT
  • Chiller Plant Control Sequence
  • Chillers
  • Combined Cooling Heating & Power Systems
  • Cooling Towers
  • Cost Effective and Energy Efficient Air Side Economizer Systems
  • Data Center Air Conditioning
  • Demand Control Ventilation
  • Displacement Ventilation Systems
  • Ducting System
  • ELECTRIC CHILLER SUPPLIERS
  • Energy Efficient Pumping
  • Energy Recoveries
  • Fans For High Performing HVAC
  • Green Building Design
  • Green Solution
  • Hospital HVAC
  • How to Control Low Chilled Water delta-T
  • HVAC ENGINEERS
  • Indoor Air Quality
  • Insulations
  • Kitchen Ventilation
  • Night Time Precooling
  • Noise Control
  • Optimized Chiller Operation
  • Pumping Solutions
  • Refrigerant Pipng
  • Smoke Management Systems
  • Solar Energy Systems
  • Thermal Energy Storage for Cooling
  • Variable Frequency Drives
  • Variable-Flow Pumping Systems

Archives

 

April 2012
M T W T F S S
« Dec    
  1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30  

Recent Comments

  • HVAC Evaporators on Selection of Condensers for Air Conditioning Systems
  • louvre windows on Air Conditioning Systems for Restaurants
  • HAVC Units on How to Achieve Low Humidity Conditions with Minimum Energy Consumption
  • dentist on Identifying Objectionable Noise Sources in Air Conditioning Systems
  • ideas for window treatments for bay windows on High Performance Strategies for Solar Protection

Meta

  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org