Professional Background of HVAC Engineer Engr. Nisar Ahmad Alvi

22May/117

HVAC ENGINEER

Engr. Nisar Ahmad Alvi

•Father’s Name: Mushtaq Ahmed
•NIC NO. 4210-4772022-3
•Date of Birth: 22nd October 1959
•Marital Status: Married
•Citizenship: Pakistani
•PEC Reg. No. ELECT/ 17219

Address: B-228, Block L, Street No.7, North Nazimabad, Karachi-74700.
92-21-36644589, 92-300-2619261; E-mail: [email protected]

Career Objective

Seeking Engineering management and administrative job

Professional Education
Year Degree University / College Score
1993 Bachelor of Engineering
(Electrical) NED University of Engineering and Technology Karachi. 1st Division
1987
B.Tech (Hons)
NED University of Engineering and Technology Karachi.
3.96 CGPA
First Position

1980
Diploma of Associate Engineer
Govt. College of Technology Site.
1st Division

Education
1986 B.A Karachi University Private 1st Division

Professional Experience
08-04-1996 to till date
•Working as executive engineer in KESC posted at Uthel bel, Lyari, N. Nazimabad, North Karachi and different areas

17-03-1984
•Joined KESC as Sub Engineer and posted at different zones in Karachi

1982-1982
•Worked as Electrical engineer in SIEMENS PAKISTAN ENGINEERIG CO LTD

Professional Achievements

•Appreciation certificate on performance of theft detection field survey team (2005)
•Became life time member Pakistan Engineering council (1999)
•Recommended for confirmation/promotion (Performance evaluation report from Executive engineer, North Nazimabad) KESC (1999)
•Former team member for establishment of KESC Compliant cell for North Karachi Industrial area, Generation, Maintenance and Construction network/service consumer connection residential, commercial, industrial power in different area of karachi
•Training in the installation and maintenance department of Siemens Power and Motor, Transformer & switch gear
•Part of team who had developed detailed study report regarding Electrical Klectro System.
•Sub division officer(SDO) in different areas of Karachi consulting billing department
Personal Data

Tagged as: engineer, HVAC, karachi, management
Leave a comment

Comments (7)
Trackbacks (0)
( subscribe to comments on this post )

  1. Hello Web Admin, I noticed that your On-Page SEO is not that great, for one you do not use all three H tags in your post, also I notice that you are not using bold or italics properly in your SEO optimization. On-Page SEO means more now than ever since the new Google update: Panda. No longer are backlinks and simply pinging or sending out a RSS feed the key to getting Google PageRank or Alexa Rankings, You now NEED On-Page SEO. So what is good On-Page SEO?First your keyword must appear in the title.Then it must appear in the URL.You have to optimize your keyword and make sure that it has a nice keyword density of 3-5% in your article with relevant LSI (Latent Semantic Indexing). Then you should spread all H1,H2,H3 tags in your article.Your Keyword should appear in your first paragraph and in the last sentence of the page. You should have relevant usage of Bold and italics of your keyword.There should be one internal link to a page on your blog and you should have one image with an alt tag that has your keyword….wait there’s even more Now what if i told you there was a simple WordPress plugin that does all the On-Page SEO, and automatically for you? That’s right AUTOMATICALLY, just watch this 4minute video for more information at. WordPress Seo Plugin

    ( REPLY )
  2. I do admire the direction in which you have highlighted this specific challenge and it does indeed offer me some fodder for study. Nonetheless, coming from what I have experienced, I just wish when other responses add on that men and women stay on issue and don\’t commence upon a rant involving the news of the day. Regardless, thank you for this exceptional piece and even though I can not fully concur with your comments in totality, I value your perspective.

    ( REPLY )
  3. 45000Backlinks.com
    October 4th, 2011 – 08:45

    Wow man, what an amazing blog. Keep up the nice work!

    ( REPLY )
  4. SEO Ebook kostenlos
    October 4th, 2011 – 16:45

    Hello friend I appreciate you for revealing this post with us. Commonly i really don\’t investigate Websites. However i exactly like it. If only extra content articles and also written content on the web will be just as much as helpful and also beneficial compared to this particular one. Terrific posting, thanks a lot Regards.

    ( REPLY )
  5. I had been extremely pleased to get this kind of internet-site.I need to to help cheers as part of your occasion due to this superb understand!! When i positively making the most of any little little bit of it and also I have you bookmarked to consider examine new things you blog site post.

    ( REPLY )
  6. Hey Friend, Awesome blog. I will post a link on my facebook page.

    ( REPLY )
  7. the information you have on your site is great, full of relenat information,just what i have been searching for?
    thanks

    ( REPLY )

Leave a comment Cancel reply

(required)

(required)



No trackbacks yet.

Electric Chiller Suppliers »
« HVAC ENGINEER

Recent Posts

  • OPTIMUM CHILLER PLANT SEQUENCE OF OPERATION
  • EFFICIENCY IMPROVEMENT AND OPERATING COST REDUCTION BY BUILDING BMS SYSTEM
  • Salient Features of Energy Efficient Homes
  • Interesting story idea for your readers
  • Coordinated Practices for Green Building Design
  • Use of Thermal Images for Indoor Environmental Control
  • Absorption Chiller Suppliers
  • Improving Efficiency of Existing Data Centers
  • Electric Chiller Suppliers
  • HVAC ENGINEER
  • HVAC ENGINEER
  • ENERGY EFFICIENT OPERATION OF COOLING TOWERS
  • Salient Features of Healthcare AHU
  • Multipurpose Hall Environment Control
  • Piping Network Considerations for Air Conditioning System

Categories

  • Absorption Chiller Suppliers
  • AHU Coils
  • Air Conditioning Systems
  • Air Distribution
  • Air Filtration
  • Air Handling Units
  • Building Management System
  • Chilled Water Plant ΔT
  • Chiller Plant Control Sequence
  • Chillers
  • Combined Cooling Heating & Power Systems
  • Cooling Towers
  • Cost Effective and Energy Efficient Air Side Economizer Systems
  • Data Center Air Conditioning
  • Demand Control Ventilation
  • Displacement Ventilation Systems
  • Ducting System
  • ELECTRIC CHILLER SUPPLIERS
  • Energy Efficient Pumping
  • Energy Recoveries
  • Fans For High Performing HVAC
  • Green Building Design
  • Green Solution
  • Hospital HVAC
  • How to Control Low Chilled Water delta-T
  • HVAC ENGINEERS
  • Indoor Air Quality
  • Insulations
  • Kitchen Ventilation
  • Night Time Precooling
  • Noise Control
  • Optimized Chiller Operation
  • Pumping Solutions
  • Refrigerant Pipng
  • Smoke Management Systems
  • Solar Energy Systems
  • Thermal Energy Storage for Cooling
  • Variable Frequency Drives
  • Variable-Flow Pumping Systems

Archives

 

April 2012
M T W T F S S
« Dec    
  1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30  

Recent Comments

  • HVAC Evaporators on Selection of Condensers for Air Conditioning Systems
  • louvre windows on Air Conditioning Systems for Restaurants
  • HAVC Units on How to Achieve Low Humidity Conditions with Minimum Energy Consumption
  • dentist on Identifying Objectionable Noise Sources in Air Conditioning Systems
  • ideas for window treatments for bay windows on High Performance Strategies for Solar Protection

Meta

  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org