In a multi level building mechanical and electrical system lines move vertically up and down, up to full height of the building. These include chilled and hot water pipes from plant room to air handling unit rooms. Air ducts from AHU rooms to each floor move both vertically and horizontally.

Structural provisions are planned during design stage. These are coordinated with architectural and structural teams. Location of these openings is selected keeping in view access for maintenance. Easy access is required to these shafts during operation of the building. Working space in front of access panels is provided for ease of maintenance work.

These openings are coordinated with building layout. Wall along elevator well is used for this purpose. This is normally concrete wall which is vertically built. Slab openings are provided at each level along this wall, outside of well. When mechanical rooms are provided at each level, this shaft opens inside each room. All rooms are connected with this opening.

Where duct branches move horizontally from main ducts within these openings, drop beam is avoided. Drop beam further lowers duct levels. Space for fire dampers is provided for branch take offs. Units are located at a distance from these openings to provide sufficient space for unit discharge straight runs and return duct connections. Size of vertical shafts is selected keeping in mind future extensions and other services. Plumbing and fire fighting services also run along ducts and chilled water or condenser water pipes.

Normally shafts are split according to services required. Water and air services are kept separate from electrical cables and wires. Communication and data cables run in separate ducts from power cables. Splitting ducts as per services and close to area of usage reduces system losses. Instead of one large duct, two or three ducts are used at opposite ends of the building for large floor areas. Ducts and pipes for each wing or zone are separated from plant room. Building is vertically split in to sections. Services of each section run in its own riser close to area being served at each level. Less fan and pump power is used with this scheme. System performance improves.

Tagged as: air conditioning ducts, fire damper, mecahnical services, pipes, services shaft
Leave a comment

Comments (0)
Trackbacks (0)
( subscribe to comments on this post )

No comments yet.

Leave a comment Cancel reply

(required)

(required)



No trackbacks yet.

Managing Night Time and Holiday Loads »
« Selecting Air Handling Unit Fan

Recent Posts

  • Multipurpose Hall Environment Control
  • Piping Network Considerations for Air Conditioning System
  • Fan Energy Saving Systems for Space Conditioning
  • Air Handling Unit Heat Transfer Capacity
  • Green Pumping Solutions
  • Using Ceiling Space for Return Air Path
  • Managing Night Time and Holiday Loads
  • Considerations for Services Openings in High Rise Buildings
  • Selecting Air Handling Unit Fan
  • Mitigation of Plant Room Noise Transmission
  • Frictionless Chillers
  • Under Floor Air Distribution Systems
  • Part Load Performance of Screw Compressors
  • Frost Control of Evaporator Coil
  • How to Achieve Low Humidity Conditions with Minimum Energy Consumption

Categories

  • AHU Coils
  • Air Conditioning Systems
  • Air Distribution
  • Air Filtration
  • Air Handling Units
  • Building Management System
  • Chilled Water Plant ΔT
  • Chiller Plant Control Sequence
  • Chillers
  • Combined Cooling Heating & Power Systems
  • Cooling Towers
  • Cost Effective and Energy Efficient Air Side Economizer Systems
  • Data Center Air Conditioning
  • Demand Control Ventilation
  • Displacement Ventilation Systems
  • Ducting System
  • Energy Efficient Pumping
  • Energy Recoveries
  • Fans For High Performing HVAC
  • Green Building Design
  • Green Solution
  • Hospital HVAC
  • How to Control Low Chilled Water delta-T
  • Indoor Air Quality
  • Insulations
  • Kitchen Ventilation
  • Night Time Precooling
  • Noise Control
  • Optimized Chiller Operation
  • Pumping Solutions
  • Refrigerant Pipng
  • Smoke Management Systems
  • Solar Energy Systems
  • Thermal Energy Storage for Cooling
  • Variable Frequency Drives
  • Variable-Flow Pumping Systems

Archives

 

March 2011
M T W T F S S
« Feb    
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31  

Recent Comments

  • admin on Air Conditioning Duct Designing For Minimum Losses
  • payday advance loan idaho on Air Handling Unit Heat Transfer Capacity
  • Air Pollution Indoors on Air Conditioning Duct Designing For Minimum Losses
  • Maxine Catalli on Air Conditioning Duct Designing For Minimum Losses
  • Lakendra Krokus on How to Reduce Makeup Air Requirement for Kitchen Ventilation

Meta

  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org